Power Distribution Pod - Genset Pod

  1. Adopts a medium voltage genset parallel system;

  2. Uses 2 parallel output groups, each with 9+1 gensets;

  3. Meets Tier 3 standards with dual bus power supply;

  4. Requires a double-layer steel platform layout outdoors, with an estimated area of 2000 square meters;

  5. Based on site requirements, if there is no space for oil tanks, a 12-hour fuel tank can be added under the gensets. However, special consideration is needed for the steel platform structure and load-bearing capacity.